5 POs with SDV CONSTRUCTION INC at Military Affairs. Click a PO ID to see its line items.
| PO ID | Description | Contract ID | PO Date | Total Amount | Amount Expended | Balance |
|---|---|---|---|---|---|---|
| — | — | — | — | $8,127,971.46 | $1,050,287.40 | $7,077,684.06 |
| 0000023425 | 26-F7S-C-3525SF10 Back-up generator at the Santa Fe HQ. The project will result in the construction of an emergency/back-up generator room and installation of the generator. | 40705002300607BF | 09-29-2026 | $3,583,001.48 | $0.00 | $3,583,001.48 |
| 0000023210 | 25-E7S-C3525RO01 Belen RCRoll Over FY 2026 PO balance to encumber w/FY 2027 funding 1 @ $794308.29**Note: Rollover amounts include $13,245.96 for additional work required for the Seismic Bracing of the Fire Suppression System. |
The New Mexico Sunshine Portal was created pursuant to the Sunshine Portal Transparency Act, NMSA 10-16D-1 et. seq, to provide public access to state government budgets, expenditures, revenue and specific public school district information, and to make such information accessible on one central website. The Sunshine Portal Transparency Act was enacted by the Fiftieth Legislature, First Session and signed into law by Governor Susana Martinez on March 30, 2011. The web site will be updated monthly, the currency of the data will be published on each information panel.
| 40705002300607BF |
| 08-04-2026 |
| $1,590,616.59 |
| $0.00 |
| $1,590,616.59 |
| 0000023224 | 25-E7S-C-3524BE01BRO Belen RC Phase 1 ConstructionRoll Over FY 2026 PO balance to encumber w/FY 2027 Funding | 40705002300607BF | 08-05-2026 | $1,588,616.59 | $1,050,287.40 | $538,329.19 |
| 0000023403 | 26-27-F7S-C-3524SA02 TAXIWAY GATE @ AASF (Provide materials, labor & equipment to replace the main taxiway gate, remove and replace existing gate, concrete, pavement, shoulder, lighting, and control system) | 40705002300607BF | 09-25-2026 | $682,868.40 | $0.00 | $682,868.40 |
| 0000023407 | 26-F7S-C-3524SA02 Replace the main taxiway gate at the AASF. Existing gate removal and replacement, concrete pavement, asphalt shoulder lighting and control system. | 40705002300607BF | 09-28-2026 | $682,868.40 | $0.00 | $682,868.40 |