Sunshine Portal · Section
WAGNER EQUIPMENT COMPANY
Purchase orders that Agency has placed with WAGNER EQUIPMENT COMPANY for FY2027. Click a PO to see line items and detail.
Data as of: September 30, 2026Updated: October 14, 20269 records
- # of Purchase Orders
- 9
- Total Amount
- $41,831.53
- Balance
- $41,831.53
Purchase Orders
9 POs with WAGNER EQUIPMENT COMPANY at Agency. Click a PO ID to see its line items.
FY2027 · Executive
Filters
| PO ID | Description | Contract ID | PO Date | Total Amount | Amount Expended | Balance |
|---|---|---|---|---|---|---|
| — | — | — | — | $41,831.53 | $0.00 | $41,831.53 |
| 0000023121 | 26-0061 Repair and Replacement of control board and motherboard of generator at Building 1047. ENG Field Labor - Governor, 20 @ $166.00 | 40000002300045AF | 07-24-2026 | $14,694.57 | $0.00 | $14,694.57 |
| 0000023382 | 26-F5S-206 GENERATOR ANNUAL INSPECTIONLAS CRUCES AASFItem# 36Perform Annual PM-2 on 1000KW Emergency Generator. Parts @ $750.00Labor @ $2,500.00I each = $3,250.00 | 40000002300045AF | 09-18-2026 | $5,853.36 | $0.00 | $5,853.36 |
| 0000023366 | 26-F5S-212 USPFO - Annual inspections and service for the generators. Travel to/from to site- 80@$4.00=$320.00 | 40000002300045AF | 09-16-2026 | $4,986.88 | $0.00 | $4,986.88 |
| 0000023383 | 26-F5S-205 GENERATOR ANNUAL INSPECTIONSFANG AASF Airport Santa Fe NMParts @ $600.00Labor @ $1,900.001 each = $2,450.00 | 40000002300045AF | 09-18-2026 | $4,494.28 | $0.00 | $4,494.28 |
| 0000023367 | 26-F5S-211 Rio Rancho Readiness Center - Annual inspections and service for the generators. Travel to/from to site- 20@ $4.00=$80.00 | 40000002300045AF | 09-16-2026 | $2,585.16 | $0.00 | $2,585.16 |
| 0000023381 | 26-F5S-207 GENERATOR ANNUAL INSPECTIONSFANG ONATE VISITORS CENTERItem #13PM -2 Inspection, replace engine oil, oil and fuel filters. Fluid analysis engine oil, coolant basic and fuel completeParts @ $300Labor @ $1,0501 each= $1,350.00 | 40000002300045AF | 09-18-2026 | $2,543.75 | $0.00 | $2,543.75 |
| 0000023380 | 26-F56-208 GENERATOR ANNUAL INSPECTIONFARMINGTON ARMORYItem # 13Labor: PM-2 replace engine oil, replace oil and fuel filters.Perform fluid analysis. oil, coolant basic and fuel completeParts 1 @ $250.00Labor 1 @ $110.001 each = $1,350.00 | 40000002300045AF | 09-17-2026 | $2,509.66 | $0.00 | $2,509.66 |
| 0000023379 | 26-F5S0210 GENERATOR ANNUAL INSPECTIONSANTA FE ARMORYItem # 2PM-2 CAT C4.4 replace engine oil, oil and fuel filtersParts 1 @ $120.00Labor 1 @ $630.001 each = $750.00 | 40000002300045AF | 09-17-2026 | $2,093.81 | $0.00 | $2,093.81 |
| 0000023386 | 26-F5S-209 GENERATOR ANNUAL INSPECTIONSFANG DOIMItem # 2PM-2 Service replace oil and fuel filters, engine oilParts @ $200.00Labor @ $550.001 each = $750.00 | 40000002300045AF | 09-18-2026 | $2,070.06 | $0.00 | $2,070.06 |
Showing 1 to 9 of 9 entries
← PrevPage 1 / 1Next →